February 1nd - 17th, 2018  Overview of our work during the stay in Mexico

 

17.2.
Fuel Supply:
- Filled tank with 55 gal to around 50%
- Calibrated Fuel Level Gauge
- Marked Measuring Stick with level lines and compared it to Fuel Level Gauge

16.2. Fr
Fuel Supply:
- Compared and calibrated Fuel Level Gauge with existing Water Level Gauge

15.2.
- Fuel Supply: cleaned tank
- Mounted 2nd VHF Antenna

14.2.
- Fuel supply: adjusted inspection opening for Fuel Tank starboard side and fitted lid. Tank partially cleaned.
- Fuel Supply: drilled holes for Fuel Level Gauge and bolts into Fuel Tank starboard side
- Mounted 2nd Speaker in cockpit

13.2.
- Fuel Supply: drilled holes for inspection port and bolts into Fuel Tank starboard side
- Updated Chartplotter
- Repaired bad wire connection for Light Distribution in cockpit

12.2.  Mo
- Mounted Ropecutter onto Shaft infront of Propeller with diving equipment
- Cleaned Hull and cleaned off a few Barnacles

11.2.
- Wired handheld radio charging station close to companion way
- Wired USB ports in owners cabin
- Fitted inside of nav table

10.2.
- Repaired Waterheater (broken fuse)

9.2. Fr
- Wired SSB Radio to Battery
- Took SSB into operation
- Shifted alternator
- Mounted ship bell in cockpit

8.2.
- Demounted alternator for shifting position and adapted mount
- Wired SSB Radio to Battery

7.2.
- Glued Dinghy transom to bottom
- Wired SSB Radio to Tuner in Lazarette

6.2.
- Mounted and wired SSB Tuner in Lazarette
- Preparation for Dinghy repair

5.2. Mo
- Outboarder break-in phase


We are on Facebook, look for sailingtruegrit or take the link:

Wir sind auch bei Facebook, such nach sailingtruegrit oder nimm den Link:

https://www.facebook.com/sailingTrueGrit

We are on Instagram, look for sailingtruegrit or take the link:

Wir sind auf Instagram, such nach sailingtruegrit oder nimm den Link:

https://www.instagram.com/sailingtruegrit/